A grab rail has been fitted to the stovage area on the port side of the cabin. It is a 30 mm diameter 1.9 meter long stainless steel pipe. It is fastened with two layers uni directional carbon fibre in NM-epoxy. It gives a good grip and is solid.
Except instrument panel and electronics and places for books the work in the cabin is now done.
I will now start on the aft deck house.
I have made several full scale mock ups of it. On each one I have changed many details. Below is a picture of how one of the windows have been moved around. I am now completely satisfied with its position.
Sitting close to a small window in comfort, looking out over endless horizons, days after days is a blessing.
To be continued…
Regards Yrvind.